References

Find out who has chosen us.

First-rate partners on the Italian scene have chosen CR Project Service.
Because we always strive to improve our standards and every successfully completed project enriches our experience.

MAIN PROJECTS

Impianto Latina
Latina
Impianto Alzo

Alzo

Impianto Blusolar
Blusolar Uno
Framework Agreement TERNA RFI
German Fund KGAL
Morigallo PV Plant
CONAD Logistic center
Macchiareddu TES
Montalto PV Plant

WORK IN PROGRESS

Year
2024
2024
2024
2024
PROJECT
BESTER NEW ENERGY
LIMES17
ACME
LIMES6
EPC
PLACE
MONTALTO DI CASTRO (VT)
SICILY
MONTALTO DI CASTRO (VT)
SANTI COSMA E DAMIANO (LT)
DESCRIPTION
Design and construction of an SSE and HV/MV cable-duct for a 48MWp plant in Montalto di Castro (VT)
Design, supply, construction and maintenance of a 220Kw SSE and electro-duct for a PV plant with nominal capacity of 86.2MWp dc/93.03 ac in Sicily
Construction of a connection line for a PV plant in Montalto di Castro (VT) with a nominal capacity of 87MVp/79,2MW AC with turnkey formula
Construction, with turnkey formula, of the connection line for a PV plant in Santi Cosma e Damiano (LT) with a nominal capacity of 8,450kWp dc/8,550 kW ac

REFERENCES

YEAR
2022
2022
2022
2022
2022
2022
2020
2020
2020
2020
2019
2019
2018
2018
2018
2018
2018
2016
2016
2016
2015
CUSTOMER
BASIC SRL
ECG LATINA
KGAL
ENEL GREEN POWER ITALIA SRL
AGRO SOLAR I SRL
CANTIERI ITALIANI
TERNA RETE ITALIA
ACEA
EUROPEAN ENERGY
ITALGAS SPA
EUROPEAN ENERGY
TERNA RETE ITALIA
EDISON
ENEL GREEN POWER
TERNA ENERGY SOLUTIONS
OCTOPUS INVESTMENT
OCTOPUS INVESTMENT
TERNA PLUS
OCTOPUS INVESTMENT
ENI
CONAD TIRRENO SOC. COOP
EPC
CR PROJECT SERVICE SRL
CR PROJECT SERVICE SRL
CR PROJECT SERVICE SRL
TEMPORARY BUSINESS WITH: BOFFETTI SPA - CR PROJECT SERVICE SRL - PELLICELLI SRL
CR PROJECT SERVICE SRL
CR PROJECT SERVICE SRL
TERNA RETE ITALIA
COMAL IMPIANTI SRL
CR PROJECT SERVICE SRL
ARGELATO SRL
RCM COSTRUZIONI
TERNA RETE ITALIA
GEKO SPA
POWERCROP MACCHIAREDDU
TERNA ENERGY SOLUTIONS
CR PROJECT SERVICE SRL
COMAL IMPIANTI SRL
TERNA PLUS
COMAL IMPIANTI SRL
ENI SCOGAT TUNISIA
3EPC
PLACE
TARQUINIA (VT)
ARLENA DI CASTRO (VT)
MACCHIAREDDU
CONEGLIANO (TV)
VALENTANO - SAN LORENZO (VT)
TROIA (FG) – ITALIA
ROMA - ITALIA
TROIA - ITALIA
MONTALTO DI CASTRO - ITALIA
SAN GIORGIO LA MOLARA (BN) - ITALIA
MACCHIAREDDU (CA) - SARDEGNA - ITALIA
CIVITA CASTELLANA(VT)- LAZIO - ITALIA
VITERBO - ITALIA
CIVITA CASTELLANA (VT) - LAZIO - ITALIA
MONTALTO DI CASTRO (VT) - ITALIA
MONTALTO DI CASTRO (VT) - ITALIA
TUNISIA
VENTURINA (LI) - ITALIA
DESCRIPTION
Design and construction of an MV power line for the connection of photovoltaic systems "BASIC" to the power plant of Enel Distribuzione
Realization of an MV connecting duct to the photovoltaic plant ECG LATINA and the power plant of Enel Distribuzione
Design and construction of an HV/MV electrical substation with double user stall and construction of an electroduct for the grid connection to Terna NTG
Realization, in EPC formula, of the substation and HV line for "Piani della Marina" PV plant
Realization of the user substation and HV-MV Cableduct in turnkey formula
Enlargement of 150/30 kV User substation and MV connecting cable to the PV fields
Supply and installation of MV panels for the HV stalls of the electrical substation
Realization of the field electrical works for two photovoltaic systems
Realization of the video surveillance system for the largest photovoltaic park in Italy (103 MW)
Construction of a photovoltaic system on the roof of the Italgas headquarters
Realization of the field electrical works for a photovoltaic system (63MW) and of the MV connecting cable duct
"Cassiopea" Electrical substation O&M service
Installation of HV cable in service of a wind farm
Realization of the HV connection for the electrical "Rumianca" substation
Realization of Tosti User’s substation 150/20kv 30 MVA, the MV connections with the Cilea and Tosti photovoltaic fields and the HV connection with the future NTG station, in the "turnkey” formula
Realization of the MV connection cable duct for the two photovoltaic systems "Pergolesi"
Realization of electrical works for the photovoltaic system "Cilea" (14.4 Mwp)
Upgrading of the "Cassiopea" station stall for the construction of MV connections with the photovoltaic production plants of "Paganini", "Puccini", "Rossini", "Verdi" and "Vivaldi" fields.
Supply and installation of five delivery cabins, MV switchboard and meters
Realization of perimeter LED lighting in gas compression stations on various sites
Construction of a photovoltaic system (17,50kw) on a roof of a petrol station